The following warnings occurred: | |||||||||||||||
Warning [2] Undefined property: MyLanguage::$archive_pages - Line: 2 - File: printthread.php(287) : eval()'d code PHP 8.2.20 (Linux)
|
![]() |
132 construction begins monday - Printable Version +- Punaweb Forum (http://punaweb.org/forum) +-- Forum: Punaweb Forums (http://punaweb.org/forum/forumdisplay.php?fid=3) +--- Forum: Punatalk (http://punaweb.org/forum/forumdisplay.php?fid=10) +--- Thread: 132 construction begins monday (/showthread.php?tid=20942) Pages:
1
2
|
132 construction begins monday - kalakoa - 06-07-2019 https://www.hawaiitribune-herald.com/2019/06/07/hawaii-news/work-to-restore-lava-covered-potion-of-highway-132-begins-monday/ Two contractors -- Isemoto Contracting Co. and Ludwig Construction Inc. -- were selected in what Kim described as a "running bid" process, where equipment, manpower and time will be factored into the price tag, which Yamamoto estimated at $11.9 million. Only $3.7 million per mile. Surprised there wasn't anything in the rumor mill until this sudden announcement. RE: 132 construction begins monday - HereOnThePrimalEdge - 06-07-2019 Only $3.7 million per mile. From the article: The project was described as an “initial ‘temporary’ access restoration phase” Imagine what it would cost if it were permanent. RE: 132 construction begins monday - alaskyn66 - 06-07-2019 Four months to do three miles... during hurricane season. Time to stock up on popcorn.. RE: 132 construction begins monday - kalakoa - 06-07-2019 during hurricane season. Well, yeah, they had to wait for permits. Because permits are the most important thing. RE: 132 construction begins monday - Obie - 06-11-2019 "Permitting requirements for temporary road construction were completed, the County says, “including the National Pollutant Discharge Elimination System (NPDES) permit, the National Environmental Policy Act (NEPA) Categorial Exclusion (CatEx) permit, Special Management Area (SMA) permit, and a grading permit which will be reviewed by DPW and State Historic Preservation Division.” The County plans to complete the temporary road by October 2019. Doing so will qualify the County for a 100% percent reimbursement of the cost from the federal government." More : https://www.bigislandvideonews.com/2019/06/10/video-lava-clearing-on-highway-132-begins/?fbclid=IwAR01L-ARz4izFsOFpfAAQvglm_jjDYZUNEADK_k0Ef0CUREdaFuktZIcKis RE: 132 construction begins monday - kimo wires - 06-13-2019 So reconnecting to 4 corners and lighthouse road. So will there be easier access to the new black sand beach there? Parking close by? Any plans to reconnect to Red Road/ Pohoiki ? RE: 132 construction begins monday - Obie - 06-13-2019 I'm not sure it will be connected to the lighthouse road.There are some problems there because the light house road is partially on private property. RE: 132 construction begins monday - leilanidude - 06-13-2019 and a grading permit which will be reviewed by DPW and State Historic Preservation Division.” ----------- Sure. Because 50 feet of new lava obviously is full of cultural artifacts and bones of dead folks. RE: 132 construction begins monday - Obie - 06-14-2019 "Only $3.7 million per mile." 4 lane divided highway complete with bike lanes and several multi lane roundabouts. Rest areas will be provided for weary travelers along with view areas. RE: 132 construction begins monday - glinda - 06-14-2019 Sure. Because 50 feet of new lava obviously is full of cultural artifacts and bones of dead folks. Maybe not, but God help anyone that disturbs the olivine! I mean sure, go for the plagioclase, but omg how dare they disturb the olivine! |