11-02-2010, 11:33 AM
You can replace existing siding, you can replace existing roofing, rotted boards like purlins, etc but once you get into the electrical and plumbing replacement you are supposed to be pulling permits.
A complete demo/removal of a previously permitted building does require a demo permit.
The code reads for things like say a ceiling fan, swap out a cracked toilet bowl, or a garbage disposal that you are supposed to pull a permit. I dont think anyone every does but when you get into the new circuits, or adding fixtures .... thats a little different.
Catherine Dumond
Blue Water Project Management 808 965-9261
Dakineworkers.com
A complete demo/removal of a previously permitted building does require a demo permit.
The code reads for things like say a ceiling fan, swap out a cracked toilet bowl, or a garbage disposal that you are supposed to pull a permit. I dont think anyone every does but when you get into the new circuits, or adding fixtures .... thats a little different.
Catherine Dumond
Blue Water Project Management 808 965-9261
Dakineworkers.com