Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Septic and cesspool engineering
#16
Ps, a dozer can't dig a cesspool. You need a machine with a hammer and a long arm. When you use a dozer to do drive and site prep, you still have to pay to get a whole other machine in there for the cesspool, and you end up paying more. A dozer can clear and level a bit faster, but you pay on average twice as much more per hour for a dozer over an excavator, so there's no savings unless you are ripping (read:clear cutting) the majority of the lot.

Melissa Fletcher
___________________________
"Make yurts, not war" Bill Coperthwaite, 1973
Melissa Fletcher
___________________________
"Make yurts, not war" Bill Coperthwaite, 1973
Reply


Messages In This Thread
Septic and cesspool engineering - by zzz - 12-11-2012, 04:47 PM
RE: Septic and cesspool engineering - by fruitbat - 02-06-2013, 08:33 AM
RE: Septic and cesspool engineering - by mailes - 02-06-2013, 11:44 AM
RE: Septic and cesspool engineering - by mailes - 02-10-2013, 05:36 AM
RE: Septic and cesspool engineering - by mailes - 02-14-2013, 04:33 AM
RE: Septic and cesspool engineering - by mailes - 02-14-2013, 06:56 AM
RE: Septic and cesspool engineering - by Amock - 02-27-2013, 05:29 PM
RE: Septic and cesspool engineering - by mailes - 02-28-2013, 05:45 AM
RE: Septic and cesspool engineering - by Amock - 03-01-2013, 06:06 PM
RE: Septic and cesspool engineering - by YurtGirl - 03-14-2013, 03:20 PM
RE: Septic and cesspool engineering - by YurtGirl - 03-15-2013, 03:24 AM
RE: Septic and cesspool engineering - by YurtGirl - 03-15-2013, 03:30 AM
RE: Septic and cesspool engineering - by YurtGirl - 03-15-2013, 05:35 AM
RE: Septic and cesspool engineering - by YurtGirl - 03-15-2013, 05:55 AM
RE: Septic and cesspool engineering - by pslamont - 03-16-2013, 11:43 AM
RE: Septic and cesspool engineering - by zzz - 05-06-2013, 12:27 PM
RE: Septic and cesspool engineering - by zzz - 06-02-2013, 12:59 PM

Forum Jump:


Users browsing this thread: 4 Guest(s)