09-04-2015, 03:00 AM
1. I'm told that current code requires a continuous concrete shear corner (4' each side and 19" tall) for post-n-pier construction.
2. Slab with embedded plumbing has always seemed like a bad idea to me.
2. Slab with embedded plumbing has always seemed like a bad idea to me.