01-14-2016, 06:54 AM
Just had our post and pier foundation poured according to the new code. I think we missed being grandfathered in with the "on top of the ground" piers by three months. It sure was a hassle getting it done. Inspectors sign off on it after the termite treatment and before the concrete is poured.
The contractor poured my concrete cesspool cover at the same time. Cesspool was installed 7 months prior.
The contractor poured my concrete cesspool cover at the same time. Cesspool was installed 7 months prior.