06-15-2016, 03:53 AM
my experience with the final was it was the easiest to get through. he had already given me the 2 things i had to change, the plumbing and electrical was signed off by those inspectors, pretty much a walk through and congrats... be nice and there shouldn't be a problem unless you added something.