04-17-2023, 12:44 PM
Popeye's was delayed because of building permit problems along with Domino's and O Reilly's.
This is where I'm confused. I thought the whole point of paying premium rent for brand-new class-A retail space was that permitting would be simplified.
Meanwhile on Oahu, a local business managed to convert an Outback Steakhouse in a matter of weeks. Unlike Luquin's 2 or Coco Cantina 2. Maybe it's an Oahu thing.
https://www.khon2.com/local-news/local-r...-industry/
This is where I'm confused. I thought the whole point of paying premium rent for brand-new class-A retail space was that permitting would be simplified.
Meanwhile on Oahu, a local business managed to convert an Outback Steakhouse in a matter of weeks. Unlike Luquin's 2 or Coco Cantina 2. Maybe it's an Oahu thing.
https://www.khon2.com/local-news/local-r...-industry/