(07-15-2023, 09:00 AM)elepaio pid= Wrote:Lead engineer said it ..lets see how. I envision them building new half first with some basic ( logic applied ) traffic control ..
That engineer must be a complete and totalĀ genius.
Since the design of the replacement bridge has not even been done yet, how any engineer can say how it would be constructed must be able to know the future!
And again - it's an existing one lane bridge.
How do you close half of one lane and still allow traffic?
Applying logic as well!