It seems the decision has been made that the full monte "fix the boat entrance" project will NOT take place for Pohoiki. That would be a radically expanded project that either 1) clears all the debris/sand/rock out of Pohoiki Bay, including what was formerly known as "second bay" to the south or 2) re-clears the main channel and installs giant concrete walls on either side.
Therefore, how about this far less expensive proposal to benefit the ocean swimming area objective?
Re-dig the project just as it was before. Place a big pipe (or several) into the trench, ensuring the pipe on the ocean side extends 15-20 feet beyond the furthest edge of the debris field. Result: much cleaner water in the pond by the broad ramp.