01-26-2026, 12:10 AM
Only one half of my roof is used for catchment water and my tank is practically full. So, the hosing project has begun. It's actually going quickly, with half done in about 15 minutes. All the crap settles into the valleys if you have corrugated metal. When viewing from roofline the Pele's hair and rock dust is visible in the valleys. Not much of anything on the peaks. The water is coming off the edge with a black coloration.

