10-18-2015, 04:08 AM
A remote DSLAM (with fiber uplink, no less) has appeared at the corner of 1 and C.
Coverage range (assuming "typical" 17500 feet for G.lite ADSL2) should include most of Roads 1-4 (5 and above are a different service area), with the cutoff running diagonally (approximately halfway between E/F on 4, to approximately halfway between F/G on 1).
"Upper dead ends" (3/4 above B) are also within range.
Timeline unknown, but probably "soon" (this year), cabinet is populated, looks like it just needs a meter from HELCO.
Coverage range (assuming "typical" 17500 feet for G.lite ADSL2) should include most of Roads 1-4 (5 and above are a different service area), with the cutoff running diagonally (approximately halfway between E/F on 4, to approximately halfway between F/G on 1).
"Upper dead ends" (3/4 above B) are also within range.
Timeline unknown, but probably "soon" (this year), cabinet is populated, looks like it just needs a meter from HELCO.