Interior doors must be installed on bathrooms and any other that may be required by code.
Electrical fixtures must be installed if they are the sole light source operated by a wall switch as required by code. Receptacles must be installed. GFI receptacles and covers must be installed. Basically, ceiling fans (if not the only light source) and extra light fixtures don't need to be in but must be capped.
A spec house can't be finaled until most of the interior work is done. You could leave off the paint and floor coverings and kitchen cabinets but that's about it. It wouldn't be very appealing without those though.
Electrical fixtures must be installed if they are the sole light source operated by a wall switch as required by code. Receptacles must be installed. GFI receptacles and covers must be installed. Basically, ceiling fans (if not the only light source) and extra light fixtures don't need to be in but must be capped.
A spec house can't be finaled until most of the interior work is done. You could leave off the paint and floor coverings and kitchen cabinets but that's about it. It wouldn't be very appealing without those though.