01-13-2011, 04:21 PM
I have a client with the same concerns. What was decided was to have the posts 5' high and the client decided also the have the foundation poured 16" high on grade. The net result will be a clear space of 6'-4" under the house.
The draftsman shouldn't be concerned with this, either should the contractor except that the taller posts, stairs (and perhaps concrete) will cost more. Our plan passed the county fine.
The draftsman shouldn't be concerned with this, either should the contractor except that the taller posts, stairs (and perhaps concrete) will cost more. Our plan passed the county fine.
Assume the best and ask questions.