Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Permitting: Shop with no utilities vs Home
#4
Building permits are separate from electrical or plumbing permits. Normally a final inspection would be after roof and siding are on.

It is true that you can leave out a lot or all finish details. If it is not in the plan it would be required at final. But why deprive yourself of the benefit of water or electricity? Or a window or lanai? Not sure what your point is.
Assume the best and ask questions.

Punaweb moderator
Reply


Messages In This Thread
RE: Permitting: Shop with no utilities vs Home - by Rob Tucker - 11-16-2013, 12:31 PM

Forum Jump:


Users browsing this thread: 3 Guest(s)