11-16-2013, 12:31 PM
Building permits are separate from electrical or plumbing permits. Normally a final inspection would be after roof and siding are on.
It is true that you can leave out a lot or all finish details. If it is not in the plan it would be required at final. But why deprive yourself of the benefit of water or electricity? Or a window or lanai? Not sure what your point is.
It is true that you can leave out a lot or all finish details. If it is not in the plan it would be required at final. But why deprive yourself of the benefit of water or electricity? Or a window or lanai? Not sure what your point is.
Assume the best and ask questions.
Punaweb moderator
Punaweb moderator