Yes Naomi, we are.
Panels are different sizes, basically, 90% precut for the job, although still a couple of field cuts to make. Our standard (uncut) panels are 36 in wide by 8', 9', & 10 ' long. Weight is 4.25 lb/sf, so a 3'X10'=30sfX4.25=127.5 lbs. I think I have less fullsize 10 ftrs (15) than any other, but mostly 8's (86) at only 102 lbs each. I will most likely stack a few on my tractor forks to move to area of use, then just have to stand each one up and jockey into position.
I will definitely be posting progress and pictures.
We are seriously considering acid staining our concrete floors and about 90% convinced to do so before erecting any walls, but have to do a tad more research first. Our first slabs will be poured next week and have to wait 28 days before acid staining.
David
Ninole Resident
Panels are different sizes, basically, 90% precut for the job, although still a couple of field cuts to make. Our standard (uncut) panels are 36 in wide by 8', 9', & 10 ' long. Weight is 4.25 lb/sf, so a 3'X10'=30sfX4.25=127.5 lbs. I think I have less fullsize 10 ftrs (15) than any other, but mostly 8's (86) at only 102 lbs each. I will most likely stack a few on my tractor forks to move to area of use, then just have to stand each one up and jockey into position.
I will definitely be posting progress and pictures.
We are seriously considering acid staining our concrete floors and about 90% convinced to do so before erecting any walls, but have to do a tad more research first. Our first slabs will be poured next week and have to wait 28 days before acid staining.
David
Ninole Resident
Ninole Resident