10-30-2016, 04:15 AM
quote:
Originally posted by kimo wires
I was at the board meeting when, at that time, the Road Chairman and Crew manager when asked why it wasn't done right with 6" concrete and rebar said he wasn't informed "I wasn't notified" was his exact words. He should have been on site inspecting.
So I call BS
The 2" of asphalt sure will last on top of the macnut soil over there in front of Stoner's place. Must be nic.....