02-17-2017, 12:38 PM
Originally posted by Obie:
Try read your bylaws.
"(e) Disbursement Authorization. Non-budget expenditures shall be made only with the approval of the board."
Mahalo for the effort...what I was referring to is a budgeted expenditure...comes under road material which the board cut back 60% from previous budgets when our roads were being maintained. That's why people are putting out extra $ bc the roads are neglected = NO road material.
The $250,000 that used to be budgeted for road material every year used to get 46% of our roads laid w/fresh road material every 2 1/2-3 yrs. It's been at least 5 yrs for Kaloli Pt. I would guess it's about the same in other areas of the park bc their roads look exactly like the ones on Kaloli Pt, or much worse....powdered roads resulting in giant potholes throughout the park and blowing "fugitive dust" all over during drought. The water truck watering roads during the hottest times of the day evaporates almost as soon as it hits the ground wasting road crew time and fuel for the water truck = a waste of OUR $$$. If the board truly wants to combat "fugitive dust", they should be jamming to lay quality bonding road material on every road they can for the next 2-3 yrs to catch up. While they're at it, train the road crew how to properly roll, compact and grade bc that's equally as important to a good dirt road. The other guys should be tending to the overgrown easements.
The time you spend here quoting HPP bylaws, reading HPP minutes, knowing exactly what day and which rep resigned, assisting w/our website issues 18 months ago, reading HPP facebook, posting HPP mtg agendas and HPP facebook posts on HPP PT threads.... this is all extremely out of character for someone who doesn't own in HPP.
Try admit it, no shame.
Try read your bylaws.
"(e) Disbursement Authorization. Non-budget expenditures shall be made only with the approval of the board."
Mahalo for the effort...what I was referring to is a budgeted expenditure...comes under road material which the board cut back 60% from previous budgets when our roads were being maintained. That's why people are putting out extra $ bc the roads are neglected = NO road material.
The $250,000 that used to be budgeted for road material every year used to get 46% of our roads laid w/fresh road material every 2 1/2-3 yrs. It's been at least 5 yrs for Kaloli Pt. I would guess it's about the same in other areas of the park bc their roads look exactly like the ones on Kaloli Pt, or much worse....powdered roads resulting in giant potholes throughout the park and blowing "fugitive dust" all over during drought. The water truck watering roads during the hottest times of the day evaporates almost as soon as it hits the ground wasting road crew time and fuel for the water truck = a waste of OUR $$$. If the board truly wants to combat "fugitive dust", they should be jamming to lay quality bonding road material on every road they can for the next 2-3 yrs to catch up. While they're at it, train the road crew how to properly roll, compact and grade bc that's equally as important to a good dirt road. The other guys should be tending to the overgrown easements.
The time you spend here quoting HPP bylaws, reading HPP minutes, knowing exactly what day and which rep resigned, assisting w/our website issues 18 months ago, reading HPP facebook, posting HPP mtg agendas and HPP facebook posts on HPP PT threads.... this is all extremely out of character for someone who doesn't own in HPP.
Try admit it, no shame.

