We have a box.
If a box is defined by 4 walls...
First of four boxes, this is the Master Box - home of the Master Bedrm, Bath, WIC, Sophie's exercise/therapy rm, and my study.
Work at this point is approximately 86 manhours for wall erection. Being this is a ProTEC wall, that is like framing, sheathing, insulating, and sheetrock - rough and not finished.
It's soooo exciting :0
Pics: http://community.webshots.com/album/468915553RbjdnV/13
David
Ninole Resident
Edited by - David M on 06/29/2006 20:48:24
If a box is defined by 4 walls...
First of four boxes, this is the Master Box - home of the Master Bedrm, Bath, WIC, Sophie's exercise/therapy rm, and my study.
Work at this point is approximately 86 manhours for wall erection. Being this is a ProTEC wall, that is like framing, sheathing, insulating, and sheetrock - rough and not finished.
It's soooo exciting :0
Pics: http://community.webshots.com/album/468915553RbjdnV/13
David
Ninole Resident
Edited by - David M on 06/29/2006 20:48:24
Ninole Resident