06-07-2018, 12:34 PM
http://www.hawaiitribune-herald.com/2018...ost-ready/
Kim said all of the infrastructure in the area has been taken by lava and it would take a minimum of $5 million per mile to repair roads, which would require lava removal.
At those prices, it would be cheaper to buy everyone a "replacement" 3/2 in HPP.
Kim said all of the infrastructure in the area has been taken by lava and it would take a minimum of $5 million per mile to repair roads, which would require lava removal.
At those prices, it would be cheaper to buy everyone a "replacement" 3/2 in HPP.