Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
When will the County replace inundated roads?
#60
https://www.hawaiitribune-herald.com/201...r-pohoiki/

However, Kim said a temporary emergency access road into Pohoiki will be constructed within about two months. The proposed route would be accessible from near Mackenzie State Recreation Area and would not require the removal of the lava flow, but instead would be a graded road over parts of the flow, with sections of Highway 137 repaired for use along the route.

Reply


Messages In This Thread
RE: When will the County replace inundated roads? - by kalakoa - 10-03-2018, 04:22 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)