10-10-2006, 06:06 PM
Okay, construction folks, what do YOU plan to do during the next construction downswing?
Several decades ago, during a downswing I did upholstery instead of drafting. During the next downswing, I took a mainland construction gig for a 5,000 sq. ft. "log cabin" (won't do THAT again!) and there was that stint of driving a tour bus during the last "correction". For the next upcoming down turn, I may take up cuckoo clock repair and gardening. (Obviously, I don't need a very large income.)
Anyone else have any "contingency" plans?
Just niele, as always!
A hui hou!
Catz
Several decades ago, during a downswing I did upholstery instead of drafting. During the next downswing, I took a mainland construction gig for a 5,000 sq. ft. "log cabin" (won't do THAT again!) and there was that stint of driving a tour bus during the last "correction". For the next upcoming down turn, I may take up cuckoo clock repair and gardening. (Obviously, I don't need a very large income.)
Anyone else have any "contingency" plans?
Just niele, as always!
A hui hou!
Catz
Kurt Wilson