12-03-2021, 12:58 AM
Since we are approaching 2022, I thought it would be nice idea to start a new thread for all people looking to build a new house in Puna ... and hopefully those that recently built could chime in and give feed back of their time/cost/experiences
For example
- did you go with kit home from HPM or custom plans
- how long to get permit
-cost/time to prep a raw lot
- cost/time for septic system install
since licensed plumber and electrician are required in HI, what was lead time to get one
cost/time to get grid power hooked up to the lot if you did that.
start to finish, how long did it take
Every large project like building a house on an empty lot goes in phases.
Would be great to get an idea of the time and challenges to build in the Puna area at the current time ..
For example
- did you go with kit home from HPM or custom plans
- how long to get permit
-cost/time to prep a raw lot
- cost/time for septic system install
since licensed plumber and electrician are required in HI, what was lead time to get one
cost/time to get grid power hooked up to the lot if you did that.
start to finish, how long did it take
Every large project like building a house on an empty lot goes in phases.
Would be great to get an idea of the time and challenges to build in the Puna area at the current time ..