02-01-2022, 09:53 PM
(This post was last modified: 02-01-2022, 09:53 PM by AnalogKid.
Edit Reason: typo
)
(02-01-2022, 04:18 PM)Durian Fiend Wrote: I'd like to see the projected cost of adopting the preferred plan shown at this link, namely paving only the lettered roads.
Paved to standards similar to Fern Acres, for example.
Exactly. That's why I don't respond to those surveys, and why their results should be considered meaningless. Everybody wants wants wants. When you tell people what it's actually going to cost them, they tend to change their mind about how much they want-want-want it. Send out new surveys detailing how much it will actually cost everybody, then we'll see where the chips fall.