I posted this in another past thread:
"If you have solid rock at the surface, that's the best situation. Rent a hammer drill and a 1 1/2" bit, drill a hole about 12" deep, hammer in T-post. Repeat."
1 3/8" is the better size but 1 1/2" works too.
As for the septic system a contractor is required for it to be legal. They will have their own equipment. Mine used an excavator with jackhammer and bucket attachments, switching back and forth as needed.