03-09-2024, 01:37 AM
Thanks AaronS.
From the link, a potential timeline:
Now that the funding is in place, it should take about 3 to 4 months for Public Works to bring a professional consultant on board and work out details of the study’s scope, which will look at all of Puna for possible alternate routes instead of just a portion of the district as proposed in the previous measure.
Public Works Director Steve Pause said during a past Council meeting that it will take another 12 to 18 months, which include additional engagement with the public and stakeholders after a consultant is hired before the study is completed and any potential infrastructure projects could be proposed.
From the link, a potential timeline:
Now that the funding is in place, it should take about 3 to 4 months for Public Works to bring a professional consultant on board and work out details of the study’s scope, which will look at all of Puna for possible alternate routes instead of just a portion of the district as proposed in the previous measure.
Public Works Director Steve Pause said during a past Council meeting that it will take another 12 to 18 months, which include additional engagement with the public and stakeholders after a consultant is hired before the study is completed and any potential infrastructure projects could be proposed.