02-09-2026, 06:10 PM
(06-30-2025, 08:31 AM)tikicarver Wrote:I just saw this, and Lennie was set up by my contractor. For me, she just did the drawings, I think. People say Nick Moore is very good, and he's been very responsive to me. But I have to say a contractor has really been worth it, and probably adds only about 20% to the cost. After following along with all the permits that have been pulled and few that had to be redone, I think it is well worth it.(06-13-2025, 04:38 PM)caleeallen Wrote: We used Lennie too, and she was very quick and responsive, and I agree she was not expensive at all.
Does she just do the engineering drawings? or does she also do installation?
and how much did she charge you?
thanks

