07-03-2007, 09:43 AM
You either get an owner-builder permit or your GC pulls the permit, there is nothing between. If you are an owner-builder you can hire anyone to be your project manager, but "Project Manager" is a postion that does not require a license. You are still responsible for everything.
Aloha,
John S. Rabi, ABR,CM,CRB,FHS,PB
http://www.JohnRabi.com
Typically Tropical Properties
"The Next Level of Service!"
Aloha,
John S. Rabi, ABR,CM,CRB,FHS,PB
http://www.JohnRabi.com
Typically Tropical Properties
"The Next Level of Service!"