11-07-2007, 04:53 PM
The terms "pulled permit" or"pulling a permit" do simply refer to the issuance of a permit.
In addition to elect and plumb trades I believe there is a requirement for a specialize trade to dig the hole for the septic. Weird (I hope I'm wrong. Someone correct me).
In addition to elect and plumb trades I believe there is a requirement for a specialize trade to dig the hole for the septic. Weird (I hope I'm wrong. Someone correct me).
Assume the best and ask questions.
Punaweb moderator
Punaweb moderator