If the ripping is not required...
#12
The bid from your builder should include the dozing of the lot. Since it's only 8,000 sq.ft. and doesn't have native plants you might want to have the whole lot dozed.

Aloha,
John S. Rabi, GM,ARB,BFT,CM,CBR,FHS,PB,RB
808.989.1314
http://www.JohnRabi.com
Typically Tropical Properties
"The Next Level of Service!"
This is what I think of the Kona Board of Realtors: http://www.nsm88.org/aboutus.html

Reply


Messages In This Thread
If the ripping is not required... - by StillHope - 08-17-2008, 04:39 AM
RE: If the ripping is not required... - by Carey - 08-17-2008, 09:34 AM
RE: If the ripping is not required... - by Liz - 08-17-2008, 03:18 PM
RE: If the ripping is not required... - by Daniel - 08-17-2008, 03:51 PM
RE: If the ripping is not required... - by John S. Rabi - 08-17-2008, 04:00 PM
RE: If the ripping is not required... - by Carey - 08-17-2008, 05:25 PM
RE: If the ripping is not required... - by Guest - 08-22-2008, 02:22 AM
RE: If the ripping is not required... - by robguz - 08-27-2008, 06:16 AM

Forum Jump:


Users browsing this thread: 2 Guest(s)