08-03-2009, 06:48 AM
Using a Project Manager for your construction should be looked at as a method of having more control over the job, including the budget, than as a method of simply saving money. A PM can be fired. A contract, if it goes sour, is a difficulty.
Assume the best and ask questions.
Punaweb moderator
Punaweb moderator