04-15-2012, 07:53 AM
I'm looking for general advice on doing this. What the processes are, where to start. We are just at the point of getting a contract drawn up on a place we've got a verbal agreement on purchasing and I figured now's as good a time as any to start finding out as much as possible about it. The building is a 400 sq ft studio with an approx. 170 sq ft bathroom addition started. Looking at the framing in the addition, the floor joists and rafters, it appears to be well built. It needs simpson ties added at least on the addition (it's got rods through the sill plate, but no ties every 4 ft. up to the roof, which I understand is the new code). We'll probably have to tear the gyp-rock off to inspect the framing on the main part of the building (amend if needed) and to allow both plumber and electrician access to ensure everything's up to code and/or amend it.
From what I've read in threads here and other forums, the first step is find someone to draw up plans and get them submitted. We are thinking we'd get a general contractor since we're 2300 miles away most of the time, but we're not 100% certain on that since I'll be available for July/August to get started on things and my wife will have some ability to book time for the Fall/Spring.
From what I've read in threads here and other forums, the first step is find someone to draw up plans and get them submitted. We are thinking we'd get a general contractor since we're 2300 miles away most of the time, but we're not 100% certain on that since I'll be available for July/August to get started on things and my wife will have some ability to book time for the Fall/Spring.
Me ka ha`aha`a,
Mike
Mike