08-06-2008, 12:14 AM
I have a US building. We put it up in Jan of this year. The engineer who stamps the blueprints must be from Hawaii and able to oversee the project (Which they don't) Ours was stamped as well. We had to hire a draftsman to make any changes (Which was b.s.)$500.00 later we had an offical stamp that the permit dept. would accept.
Jade
Jade