The next phase of Saddle Road is almost ready to be advertised (hopefully by mid May). This solicitation entails completing most, if not all, the earthwork between m.m 41.5 and m.m 14 on Mamalahoa Highway.
https://www.fbo.gov/index?s=opportunity&mode=form&id=f1728eb54c7d0fdba9b6e079445f13a3&tab=core&_cview=0
Posts: 529
Threads: 85
Joined: Sep 2010
Saddle Rd. down to only one portion not paved now. YEA!
But on sunday there were 3 Roberts and Paradiose full size buses using the Saddle. Could really slow down now.
hawaiideborah
Posts: 820
Threads: 106
Joined: Mar 2006
The CFLHD is apparently following the previous construction schedule for the m.m 28 to m.m 41.5 segment. This phase was broken down into four bid solicitations (paving, and earthwork). It also appears the last Hilo segment between m.m 5.3 and m.m 11 isn't bid solicitation ready yet.
Posts: 2,149
Threads: 90
Joined: Feb 2006
They can't finish that last Kona side segment soon enough! I drive the Saddle every month or two, and the section under construction, even with its gravel segment, is less bothersome (and dangerous) than the remaining narrow, winding, bit with its one-lane "chicken run" bridges.