40 minutes to go 8 miles
#11
quote:
Originally posted by ericlp

What they really need is AN ALTERNATIVE route ... yeah ok I can hear you laughing now... Go back to bed nothing to see here. Smile




Joking aside, a week or so ago 30th in HPP was graded way back on both sides, almost to the fence lines, and survey stakes appeared on both sides of the road. Most of the power poles are inside those stakes. I called the hui to find out what was going on and was told that they were paving 30th from Kaloli to Makuu so it could be used as an alternate route when the highway was congested or blocked. Oh really? Never mentioned that at the homeowners meeting. In fact at the meeting it was 31st that was to be paved, not 30th, and only between Makuu and Paradise. Apparently the inmates are in charge of the asylum in HPP.





You can tell yourself anything is too difficult, or you can just do it. And you do not need to reconstruct your worldview or take issue with others. ~ SUSAN GREGORY THOMAS
I don't know how I got over the hill without getting to the top.
Reply
#12
cool, we can make 31'st ave oneway for inbound traffic and 30'th oneway for outbound traffic! Smile

But what about an alternative rout from HPP to 11? or Hawaiian Beaches to HPP? Hmmm... Ah well. Seems like poor planning tho, lucky you guys don't live in Waianae it's kinda setup like Puna only a two lane highway (each way)and if it get accident or something blocking a lane the whole thing is backed up for miles and no alternative route. People here are proposing a class action law suite for the state for not providing an alternate route since it was promised years ago and nothing happens for the local people. Thats one way to get something done Sue the bastards.
Reply
#13
quote:
Originally posted by Lin W

[quote]Originally posted by ericlp

What they really need is AN ALTERNATIVE route ... yeah ok I can hear you laughing now... Go back to bed nothing to see here. Smile




Joking aside, a week or so ago 30th in HPP was graded way back on both sides, almost to the fence lines, and survey stakes appeared on both sides of the road. Most of the power poles are inside those stakes. I called the hui to find out what was going on and was told that they were paving 30th from Kaloli to Makuu so it could be used as an alternate route when the highway was congested or blocked. Oh really? Never mentioned that at the homeowners meeting. In fact at the meeting it was 31st that was to be paved, not 30th, and only between Makuu and Paradise. Apparently the inmates are in charge of the asylum in HPP.





You can tell yourself anything is too difficult, or you can just do it. And you do not need to reconstruct your worldview or take issue with others. ~ SUSAN GREGORY THOMAS

31 between M-P and 30 between M-K were always in the Phase IV contract. The reason to Clear and Grub behind the poles is to reduce the growth onto the new road and not for paving. (part of the contract)
The reason for paving these roads is not to make an alternitive road for 130 but because of the high cost of maintenance.
The next time you call the office ask for the General Manager.


If you think health care is expensive now, wait until you see what it cost when it’s free...now here come the taxes.....
If you think health care is expensive now, wait until you see what it cost when it’s free...now here come the taxes.....
Reply
#14
quote:
Originally posted by Larry T

Dumber than dog **** Wasting time and money. They should be at Mac's with dogs and fries. The manger should get a long vac, no pay.

dumb dumb dumber


Whoa! Ah job security?