Posts: 2,980
Threads: 177
Joined: Aug 2006
Absolutely beautiful. The site of this home is breathtaking. May you have peace and wonder every day in this home.
And may we all have a great party (potluck) there when it is done!
Posts: 2,014
Threads: 46
Joined: Jun 2003
Timeline??? what's that????
Yep, a party - have to try my new keg dispenser.
FINALLY
ALL the exterior doors are in, including hardware:
8 French patio
7 Sliding patio
4 36" steel single swing
5 Garage (only 4 with openers)
ALL the windows
23 Vinyl Sliders
7 Custom built (by me) vinyl stationary
Latest pics: (including my try at a composite view of front)
http://good-times.webshots.com/album/556...N?start=24
David
Ninole Resident
Ninole Resident
Posts: 6
Threads: 1
Joined: Feb 2007
Hello David and Sophie,
My name is David and I recently met Aimee and Bob through Aimee's myspace page. Aimee has been very kind and has been telling us about all of the great friends she has on the BI and she sent pictures of yall and told me to check out the house on this site. Lookin good. I am a Chiropractor looking at moving over to Pahoa and going into practice with Dr Lozano there. We are planning a visit over for around July of this year. We would love to meet you and see your new home since we will be building eventually and would love any advice. Anyway I just wanted to say hello and I can't wait to come visit.
Have A Blessed and Grateful Day...
try me at my email address if you like jeromejohn@hotmail.com
Talk soon
Enjoy Being
David
Posts: 2,014
Threads: 46
Joined: Jun 2003
All the sheetrock is hung - 111 sheets
But not taped and spackled yet.
Actually, we finished hanging last Friday, but I just got the pics posted today:
http://community.webshots.com/album/4689...?start=372
David
Ninole Resident
Ninole Resident
Posts: 1,679
Threads: 203
Joined: Dec 2005
Did you hang the rock or have it done? Looks to clean though! Sophie must have been working overtime. What is with the brown rock in #393?
Will you be doing the taping?
Royall
What goes around comes around!
Posts: 2,014
Threads: 46
Joined: Jun 2003
Yes Royall, we hung it all ourselves - Sophie, Dale, and I.
Sophie did most of the cleanup as we moved box to box and I waited to take the pics until it was "orderly".
If I can't find someone affordable, them I'll have to tape. I'd like to hire someone to tape and thinset the ProTec, which I think will be easier, just a lot more of it. If I can find someone, then I can get on with more critical tasks like cabinets etc.
What did yo do about cabinet plans?
David
Ninole Resident
Ninole Resident
Posts: 1,679
Threads: 203
Joined: Dec 2005
I've drawn my own. Got 20 sheets of 3/4 birch coming from Trojan on Wednesday. The fun begins!
Royall
What goes around comes around!
Posts: 2,014
Threads: 46
Joined: Jun 2003
OK, I've not kept this thread nor the pic link uptodate with progress. But a lot has been done since my last posting, roof trims, some gutters, lots of mudding and taping, painting, trenching, concrete, oh did I mention painting!!!!
Anyway I have posted some almost uptodate photos, beginning page 3 of the web link:
http://community.webshots.com/album/4689...?start=396
I'm guessing about another 100 days serious work.
Enjoy
David
Ninole Resident
Ninole Resident
Posts: 1,516
Threads: 81
Joined: Dec 2005
Dave - I can't believe this project still. It is huge and amazing. What is the total living sq. ftg?
Carrie
Posts: 2,014
Threads: 46
Joined: Jun 2003
Thanks Carrie
Never sure how to answer that question. Here's the breakout
Square footage
Master Suite 882
Lanai 936
Bedroom Suites 882
Lanai 936
Lvrm/Kit/Din 1176
Lanai 630
Garage 1008
Total 6450
David
Ninole Resident
Ninole Resident