Posts: 2,019
Threads: 201
Joined: Jan 2008
From this forum I learned that
if the space under post & peer is a simple land
- no chemical anti-termites treatment is required.
But if you have a concrete under P&P then
the same area needs to be treated .
Unless concrete somehow attracts termites,it doesn't make any sense.
Or does it?
___________________________
Whatever you assume,please
just ask a question first.
Posts: 2,019
Threads: 201
Joined: Jan 2008
Any comments?
Having the concrete under the house might seem like unnecessary thing,but the house is very small and the storage space is a must.
I don't like the idea of poring poison under the house with plants around,though it is allegedly "safe".
___________________________
Whatever you assume,please
just ask a question first.
Posts: 2,019
Threads: 201
Joined: Jan 2008
No answers..
But recently I've read Big Island's post abut the roads and realised that this is the answer :
That's the moment I gave up even trying to understand the reasoning and excepted the facts,
"its not what you know"
its
"Who you Know!"
___________________________
Whatever you assume,please
just ask a question first.
Posts: 8,471
Threads: 1,033
Joined: May 2003
It is my understanding that all wood frame structures require treating the ground for termites. Post and Pier or slab. For the real facts though you should contact the Building Department (961-8331) and report back here what they tell you.
I do know that my Castleblock clients have not been required to chemically treat their ground... but we don't build with wood.
Assume the best and ask questions.
Punaweb moderator
Posts: 2,019
Threads: 201
Joined: Jan 2008
Thank you,Rob!
Somehow I was pretty sure that someone knowledgeable on the forum mentioned that fact I used in my question.
I guess I was wrong.
As far as the Castleblock materials are concerned,I deeply regret that I learned about them too late.
I still don't understand why people who build not a cabin would even consider a wood,since the price difference is not that much..
___________________________
Whatever you assume,please
just ask a question first.
Posts: 966
Threads: 61
Joined: Jan 2006
stillhope, i just completed a simple post and pier foundation, was signed off by building inspector, i called before hand and no spraying was necessary... must be up to each inspector.. was in hawaiian acres....
Posts: 798
Threads: 38
Joined: May 2005
I did post on poured footings and no termite treatment was ever mentioned, nor did anyone else I know have to treat for p&p in the past few years.
Posts: 2,019
Threads: 201
Joined: Jan 2008
Thank you,Lquade and Robguz!
That's what I was talking about.
When I posted a question about the concrete under P&P,
,I was told that the ground under that concrete needs to be treated.
Or it depends on the inspector?
___________________________
Whatever you assume,please
just ask a question first.
Posts: 1,581
Threads: 26
Joined: Jun 2007
Just to clarify, are you saying that you will have a full monolithic slab poured (as in building a building on a slab) but on top of the slab, wood post will be used to support the house and framing? In other words, the ground under the building will be a solid monolithic concrete slab and not just individual footings for each post.
Posts: 2,019
Threads: 201
Joined: Jan 2008
Yes,Bob.
I don't know the exact details,but I'd like to have a concrete floor under the "lifted" P&P,not a patches.If it's called "slab",so be it[
]
___________________________
Whatever you assume,please
just ask a question first.