03-29-2010, 04:15 PM
About a month ago I got a notice from Helco (and posted about it) that in summary said:
Call us before installing a grid tied system--we may not have room for it. The current limit is that alternative energy can only be 2 (or maybe 3) percent of the total grid load.
Jerry
Call us before installing a grid tied system--we may not have room for it. The current limit is that alternative energy can only be 2 (or maybe 3) percent of the total grid load.
Jerry