08-15-2010, 08:54 AM
There was originally 3 building permits (1 for each structure), the revision incorporated all the changes made.
The plumbing inspector needs to make a decision if one additional permit is needed incorporating all the additional plumbing fixtures or if each new fixture needs to go under the oroiginal permit #.
This is a bldg permit decision.
The plumbing inspector needs to make a decision if one additional permit is needed incorporating all the additional plumbing fixtures or if each new fixture needs to go under the oroiginal permit #.
This is a bldg permit decision.