02-23-2011, 03:49 PM
A guy down the street cleared his lava for each pier with a jackhammer down about 4 inches. Then he put some kind/Size# of gravel down, made sure he had a certain distance around each pier and padded the aggrevate down before putting down the pier. There was a code sheet he used to make sure it was correct.
My plans have not been submitted because I've put off building till 2012. The County has given me an address and my permanent Electric pole is in. Its just waiting for me to start. I would just like to all these little things available to me before I start.