03-20-2013, 03:39 PM
I think this is the fastest possible build. We received a permit to erect three structures that are steel prefabs. Pour a reinforced and thickened pad, bolt the structure on, done. We have two more we would sell at $1500 each. There are designs and renderings to expand them into (one) a modest house, (two) a larger house or two small ones connected by a breezeway.
John Maloney
310.562.0362
johnmaloney3@me.com
Hawaii Architect AR8082
www.jmagreenbuilding.com
John Maloney
310.562.0362
johnmaloney3@me.com
Hawaii Architect AR8082
www.jmagreenbuilding.com
John Maloney
310.562.0362
johnmaloney3@me.com
Hawaii Architect AR8082
310.562.0362
johnmaloney3@me.com
Hawaii Architect AR8082