11-16-2013, 12:22 PM
Speed is not my concern, ease is. I figured going this route I could get a final much easier with hopefully just an inspector to come see the forms, and then to see the framing. At that point I should get the final and I could then side it and roof it. Right? No hassles or spent money with plumbing and electric (at least not yet) and I got my building finaled. I'll deal with the upgrade permits later was my thinking.