02-08-2014, 05:47 AM
I'd like to hear Wes chime in on this and try and simplify it for everybody.
As I understand it the chipseal roads will be paved not re-chipsealed. Iilima road has been prepped for pavement and a lot of work has gone into that. To not pave it now is very wasteful and makes the BoD look very flaky. They at least need to follow through with projects they've started. And if they just do that last section of 40th then I think some diversion from the original paving plan would be agreed to by the general membership. A lot of members want that section done. More than don't want it. This is bound to remain a contentious issue. The money will likely be paid to the paving contractor before the next General meeting and the lot owners won't have any say.
As I understand it the chipseal roads will be paved not re-chipsealed. Iilima road has been prepped for pavement and a lot of work has gone into that. To not pave it now is very wasteful and makes the BoD look very flaky. They at least need to follow through with projects they've started. And if they just do that last section of 40th then I think some diversion from the original paving plan would be agreed to by the general membership. A lot of members want that section done. More than don't want it. This is bound to remain a contentious issue. The money will likely be paid to the paving contractor before the next General meeting and the lot owners won't have any say.
One Thing I can always be sure of is that things will never go as expected.