03-14-2014, 02:03 AM
My guess...the mayor was flooded with calls for the two day disaster that resulted in about 80 feet of paved shoulder. I assume work was postponed until they get a schedule in place (hopefully announced ahead of time) that is a little more productive. But once it starts, full time, it's gonna be rough for a long time.
It makes me crazy when all the political sign wavers stand at the merge with the promise of fixing the mess and it never happens. Soon, by soon I mean 2 years or so, they will all be sign waving at the Shower Drive merge back up.
It makes me crazy when all the political sign wavers stand at the merge with the promise of fixing the mess and it never happens. Soon, by soon I mean 2 years or so, they will all be sign waving at the Shower Drive merge back up.