05-19-2014, 01:53 PM
funny story. I once waited 3 months to get power because HELCO had to hire a contractor to drive in the 8 foot grounding rod. After mamy phone calls to HELCO they sent out a guy who spent 20 minutes cutting the 8 footer to 4 and he drilled and pounded.
Anyway, on my 2nd house I learned you can lay them in a trench. Not sure the depth, I think in my case is had to be more than 18 inches. Much easier.
Anyway, on my 2nd house I learned you can lay them in a trench. Not sure the depth, I think in my case is had to be more than 18 inches. Much easier.