Stan Lehman did the box scraping shoulder work and some new 3/4 minus drain rock placed on Crd from Rd 1 to Rd 2 .
So far though they are ignoring D rd from 3rd to 8 rd.
I guess those that scream the loudest get to have their roads repaired.