09-17-2014, 07:21 AM
I read a few years back, so I can't give you a link, that the contingency plan for the geothermal plant was to remove the surface equipment and move it to a safer place. The wells would then be capped by concrete pads and covered with a thick layer of gravel. If the flow stopped later on, they would come back and reclaim the wells and be back in business.