12-26-2019, 11:08 AM
HPM House Plan already permitted and I'm ready to pick contractor for my project. I have 2 bids on hand and waiting for the other 3 bids. There was a big difference in the total price for the first 2 bids and I need suggestions/advise on how to navigate this. Both bids are on one page paper with the total amount indicated. House will be built on concrete slab, 10K gallon Water Catchment, septic system. I upgraded flooring, cabinetry, bathroom tiles,countertops and outside wall sidings. All my candidates are listed at HPM lists of contractors so I assume all are licensed and bonded. I intend to speak to them before my final pick but I need advise what to ask so i can discern the best fit. I have a brother in law that resides near my lot that will be my eyes/ears during construction as work in the mainland prevents me from staying put in the island to oversee construction. Thanks for your time.