Yeah, I live here. The target project was completed. The section that didn't get paved was not part of that deal.

Although i don't understand why it wan't connected all the way
there has been some opposition to that because it would create an alternate route between 130 and 11. And some residents don't want that.

Before the upheaval . The old board did the prep, grading, and brought Iilima up to the point of being paved and then switched gears leaving that prepped road to deteriorate. And it never got paved.
One Thing I can always be sure of is that things will never go as expected.