09-16-2006, 11:04 AM
My advice is keep HELCO out of the picture except to swing your line from the transformer to the box (at the street).
IMHO, when HELCO goes to do "construction/site work" they rape and pillage on cost...
As for trenching, call any of the site guys with an excavator/track hoe (or something that will work) with a "thumb" and ask cost to trench xxx linear feet... they should be able to ball park it.
Catherine Dumond
Blue Water Project Management
808 217-7578
http://bluewaterpm.125mb.com/index.html
"We help make building your dream home a reality"
Edited by - kapohocat on 09/16/2006 15:06:06
IMHO, when HELCO goes to do "construction/site work" they rape and pillage on cost...
As for trenching, call any of the site guys with an excavator/track hoe (or something that will work) with a "thumb" and ask cost to trench xxx linear feet... they should be able to ball park it.
Catherine Dumond
Blue Water Project Management
808 217-7578
http://bluewaterpm.125mb.com/index.html
"We help make building your dream home a reality"
Edited by - kapohocat on 09/16/2006 15:06:06