06-03-2019, 03:25 AM
The TMT project has to renew their NPDES (National Pollutant Discharge Elimination System) permit, which in usual circumstances is a rubber stamp permit. However, the DOH will be holding a public hearing in Kona regarding this permit renewal on June 25th due a large amount public comment.
The NPDES permit, along with a DLNR NTP authorization, is required before construction can start.
The NPDES permit, along with a DLNR NTP authorization, is required before construction can start.